top of page

ebot fleet 

Determine the number of robots needed for your facility by calculating the distance product needs moved and how many loads per hour need moved. 

Step 1:

In order to determine the eLocation, use a drawing of your factory or facility to figure out where the robots will pick up and drop off product.

plant-playoutxxpng.png

Step 2:

Next, select the main eRoadway or travel paths the robots will take to determine the distance between locations. 

plant-playout pink line2.png

Tip: Measure the distance the robot will drive in the aisleways rather than drawing a straight line from point A to point B.

Step 3:

By taking the distance between each location and the number of loads that need moved, you can estimate the ideal number of robots (eBot Fleet) needed to get the job done. 

Click the PDF below for a expanded throughput graph. 

CALL US

EMAIL US

HOURS OF OPERATION

Tel: 704.246.3961 | Fax: 704.246.3941

Mon - Fri: 8am - 5pm

  • YouTube
  • LinkedIn
  • Facebook
AIM_E_Banner_TM 2021 RESIZE.png

8026 Tower Point Drive Charlotte, NC 28227

bottom of page